FAT verifies the equipment at the manufacturer's facilities, while SAT confirms its integration at the final location. Both must use clear and traceable acceptance criteria.

    What can be verified

    The scope varies depending on the project, but typically includes:

    • Dimensional inspection and finishing
    • Operation of instruments and interlocks
    • Agitation, pressure, or tightness tests
    • Review of the documentation package